So I've been working on switching out my 125g to a 210g. The "plan" is to have the 210g plumbed through the wall and into a basement sump.
This very "plan" involved cutting a 10"x12" hole in the wall that had been carefully measured out, twice....then hacked apart into what loosely resembled a square with a jig saw.
As the drywall dust settle I took a step back to admire my handy work. Damn I done good I thought to myself...
Then it happened, I looked down into my masterpiece of a hole to start the hole cutting process into the floor and noticed not the floor I expected to see but yet a large 2x4 brace and plastic box....hmm...guess that pesky refridgerator on the other side of the wall needs to have power and water...hmm..who knew? sigh...
This very "plan" involved cutting a 10"x12" hole in the wall that had been carefully measured out, twice....then hacked apart into what loosely resembled a square with a jig saw.
As the drywall dust settle I took a step back to admire my handy work. Damn I done good I thought to myself...
Then it happened, I looked down into my masterpiece of a hole to start the hole cutting process into the floor and noticed not the floor I expected to see but yet a large 2x4 brace and plastic box....hmm...guess that pesky refridgerator on the other side of the wall needs to have power and water...hmm..who knew? sigh...