so been working on this all weekend , sump is 99 % done , in place and ready to be plumbed , ill get you guys some pictures soon ! Ended up with 2 - 1 1/2 bulkheads so i think there will be no issues with flow , going with 3 - 1" drains ( bean animal design ) and 3/4 off the return up to two outlets , with a few valves below for future expansion . Gotta find me a sucka to help me haul this 220 downstairs !