20g done and ready for plumbing and water 20g long with drilled dual returns and overflow. Stand almost done for the tide pool and this guy then time to start running the sump filtration and big water change to get nutrient levels down. Will be easier with total water volume and sump as opposed to hobs. Running around today got me tired time to sit and relax a little bit.
Sent from my SM-G935V using Tapatalk